With fast start-up capability, low emissions and noise control, a comprehensive monitoring system, and extremely high reliability, data center generators are the cornerstone of ensuring 24/7 uninterrupted operation in the digital world.

Chinese manufacturer of data center generator sets

The generator set used in data centers is a highly complex and reliable engineering system, rather than a simple single device. The data center power system follows a high redundancy design of "2N" or "N+1".

After a power failure, the data center's generator set can quickly respond, automatically or manually start, and provide power to critical loads such as IT equipment, cooling systems, lighting, and monitoring systems.

 

Workflow of generator sets used in data centers (taking mains power failure as an example)

Mains power failure: BMS/BAS system detected a loss of mains voltage.
Send a start signal: ATS sends a start command to the generator control system.
Unit start-up and acceleration: The generator set starts and reaches the rated speed (1500 RPM for 50Hz) within seconds.
Voltage and frequency stability: The generator establishes voltage and frequency to reach a stable state.
ATS switching: After confirming that the generator power supply is stable and qualified, ATS switches the critical load from the mains side to the generator side.
Continuous power supply: The generator set continues to supply power to the load until the mains power is restored.
Mains power restoration: After ATS detects the stable restoration of mains power, it switches the load back to mains power.
Cooling shutdown: The generator set automatically shuts down after a period of no-load operation for cooling.
 

Key components of generator sets used in data centers

A complete data center generator system not only includes the engine itself, but also includes:
 
Generator set body:
Diesel engine: Power source, usually four stroke, turbocharged, intercooled.
Generator: converts mechanical energy into electrical energy.
Control system: the "brain" of the unit, controlling start, stop, operation, and protection.
 
Fuel system:
Daily fuel tank: directly supplies fuel to the engine.
Large capacity oil storage tank: ensuring long-term operation.
Fuel transfer pump and pipeline.
 
Cooling system:
Radiators: cooling the engine.
Fan: Forced ventilation for heat dissipation. In high-temperature environments, cooling system design is particularly critical.
 
Exhaust system:
Muffler: reduces operating noise.
Flexible connecting pipe: reduces vibration transmission.
Purification device: such as selective catalytic reduction system, used to reduce nitrogen oxide emissions.
 
Parallel and Switching Systems:
Automatic transfer switch: monitors the status of the mains power and automatically switches the load from mains power to generator power.
Parallel control cabinet: controls the synchronization and load distribution of multiple generators.
 
Start the system:
Battery pack: provides starting power and must always be fully charged.
Battery charger.
 

Issues of concern to users of data center generator sets

1、 What are the reasons for the lack of response when the data center generator set starts?

Possible reasons:

Battery issues (most common): battery depletion, corroded or loose connectors, battery aging.

Start motor malfunction: damaged electromagnetic switch, motor itself malfunction.

Control circuit failure: blown fuse, relay malfunction, loose wiring.

Handling method:

Immediately check: Measure the battery voltage, clean and tighten the wiring terminals.

Emergency handling: Use a backup external charger to charge the battery or start in parallel.

Professional maintenance: replace faulty batteries, starter motors, or repair control circuits.

2、What are the reasons for voltage fluctuations after the start-up of data center generator sets?

Possible reasons:

Excitation system failure: AVR (Automatic Voltage Regulator) instability or malfunction.

Winding problem: There is a local short circuit or grounding fault in the excitation winding or main winding of the generator.

Loose connection: Loose connection at the output busbar or cable connection, resulting in poor contact.

Handling method:

Check connections: Tighten all electrical connection points.

Check AVR: Observe the working status of AVR and replace it if necessary.

Insulation test: Professional personnel conduct insulation resistance tests on generators to identify winding faults.

3、What are the reasons for the sudden stop of data center generator sets during operation?

Shutdown due to high water temperature:

Possible reasons:

Cooling system issues: insufficient coolant, clogged radiator, broken or loose fan belt, water pump malfunction.

Overloaded: Long term overload operation.

Handling method:

Immediately check: After stopping the engine, check the coolant level and fan belt tension after the engine has cooled down.

Cleaning the radiator: Clean the dust and willow fluff on the radiator fins with compressed air or water.

Check the thermostat and water pump: Ensure that the coolant circulation is normal.

Low oil pressure shutdown:

Possible reasons:

The oil level is too low or the oil quality is unqualified.

Oil pump malfunction or clogged suction filter.

The engine has severe internal wear and excessive clearance.

Handling method:

Check engine oil: Check the oil level and quality, and add or replace engine oil that meets the standards if necessary.

Professional maintenance: If the oil level is normal, it may be a mechanical failure and requires professional disassembly and repair.

Related Products
1000KW diesel generator set
$98.00 $234.00
100KW diesel generator set
$324.00 $213.00
800KW Cummins diesel generator set
$199.00 $333.00
15kW_Diesel generator set
$1,557.00